Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
and equipment) in the amount of THB 115.73 million amounting to a decrease rate of 7.94 percent. Land, Building and Equipment As at 31 December 2018 and 2019, the Company’ s fixed assets ( land
solar panels, cutting grass, maintenance of equipment, and costs related to renewable energy project development overseas, (2) land rental for solar projects operating under SAAM, SAAM-1, SAAM-2, and SAAM
grass, maintenance of equipment, and costs related to renewable energy project development overseas, (2) land rental for solar projects operating under SAAM, SAAM-1, SAAM-2, and SAAM-3, and (3
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
, inclusive of CSL’s revenue and equipment rental from partnership with TOT (see significant event). Excluding IC and equipment rental, service revenue would have been +5.7% YoY and +1.6% QoQ, against the FY18
impairment testing for goodwill, equipment and intangible assets and no indications were found. The significant operating results of Bangkok Post Group which net loss improved 53.3 percent from the same period
80.95 million from Baht 227.17 million. And, the increase of Property, Plant and Equipment were Baht 409.36 million as of 31 December 2018 from Baht 316.47 million as of 31 December 2017 as a result of
to the increase of Other Long-term Investments of Baht 85.27 million from Baht 80.95 million. And, the increase of Property, Plant and Equipment were Baht 593.62 million as of 31 December 2019 from