Reclaimed Water Project Phase 2 (RO) at WHA EIE is scheduled to achieve COD in 2Q2019 with capacity of 2,500 cubic meter per day. WHAUP Nghe An Vietnam Project is scheduled to achieve COD in 3Q2019 with
project e.g. lower cullet costs, new formulation, lower sugar costs, however, somewhat offset by cost increase from natural gas. *Net Profit = Net Profit attributable to owners of the parent Financial
, the Group has backlog for construction service in oil and gas sector total of Baht 1,602.70 Million. On 18 July 2019, the Company also notify the project award of 643.68 Million Baht. (Refer to the
or approximately 724.14 percent increase when compared to the same period in 2018 as amounting of 7.14 million baht. as a result of Provision on projected potential loss on project on hand in the
expanding capacity in tap water concession. - Other non-current assets were 390.41 million Baht, increased by 39.50 million Baht from advance payment of the investment project. 2) Liabilities At the end of
, increased by Baht 151.27 Million or 43.86% compared with the same period of last year. Resulted from revenue recognition which has progress of the construction of the project on hand (Backlog) which were
HRC Average Selling Price (Bht./Ton) 18,108 15,709 HRC Cash Margin (Bht./Ton) 1,223 1,334 Unit: million Baht 3rd Quarter 2017 Year-end 2016 Fin an ce S ta tu s Total Assets 31,907 32,615 Total
around unlimited data plan. AIS had seen weaken mobile revenue due to consumer spending optimization and loss of revenue from traveler segment led to -6.5%YoY decline in mobile service revenue for FY2020
สําเร็จในการพฒันาระบบการตดิตามหนี -ในเฟสแรก โดย SIGMAXYZ Inc. จะจา่ยค่าธรรมเนยีม สาํหรับ “Project management” ให้แก่ AEON Systems เป็นจํานวนไมเ่กิน 52,212,424 บาท มูลค่ารวมของรายการ: (หน่วย: บาท) บริษัทที
are scheduled to achieve COD on 2019. VSPP, WHA KM.3 Solar with a total contracted capacity of 0.9 Equity MW, is scheduled to achieve COD in May’18. Another VSPP, Waste to Energy project under