-0195000 a priority and through controlling expenses and other various actions the group has been able to conserve cash to ensure that the Group is in a solid position going forward. In addition to the risk
able to conserve cash to ensure that the Group is in a solid position going forward. Although the financial impacts from all the cost savings measures could not compensate for the loss of revenue in the
2,728,000 2. Detail Design & Development 9,673,300 5,418,700 3,140,800 20,960,800 1. Requirement Definition 751,900 2. Detail Design & Development 3,448,900 3,290,200 1,271,800 8,762,800 1. Requirement
principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which Hemodialysis
distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which dialysis services for kidney patients
engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which Hemodialysis services
Attachment: Information Memorandum 1 Eureka Design Public Company Limited ("the Company") would like to notify the resolutions of the Board of Directors' meeting, No. 8/2020, 25th June 2020, considered and
million from telecommunication business, which is increased by Baht 335 million or 69% compared to the revenue of Baht 483 million for 2017. It results from the increase in revenue from the design and
design, work suspension or delay due to change in construction design Many projects are gradually completed. Concurrently, many new projects that have been signed into contract or about to be signed which
contracts as Subcontractor such BangPa-Kong LNG Terminal Phase 3 project (Design, manufacture, and installation of liquid gas storage tanks) the contract value of 204.12 Million Baht, and Olefins