installation work of Baht 12.26 million decreased by 60.10% from the sub- contracting project nearly completion. And revenue from rental equipment decreased 2.49%, achieved Baht 309.98 million due to the
and service 1,500.3 1,473.3 1,343.3 27.0 1.8 157.0 11.7 Cost of equipment for lease 43.0 35.3 35.3 7.7 21.8 7.7 21.8 Administrative expenses 98.5 99.9 82.9 (1.4) (1.4) 15.6 18.8 Income tax expenses 43.0
(English translation) No. BGRIM 17/2563 17 September 2020 Subject: Information Memorandum on Asset Acquisition from Investment in the Development of 7 Combined Cycle Cogeneration Plants To: President
equipment - net from depreciation despite additional investment in property, plant and equipment (THB 316 million). Liabilities As of 30 September 2017, the Company reported total liabilities of THB 4,079
associate decrease by Baht (4.17) million Investment properties increase by Baht 98.21 million Property, plant and equipment increase by Baht 552.07 million Liabilities Bank overdrafts and short-term loans
cash paid-in for share capital increase of subsidiary in China during late of September. In addition, property, plant and equipment increased by Baht 78 million which were new machines that ordered since
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
mortgage and encumbrances i.e. building structure, machinery, materials equipment and non-used equipment, etc. of Tak Smelting Plant as follows; 1. Date of Transaction : Within August 2019 2. Related parties
1,935.37 1,900.75 Selling & Administrative Expense 127.87 130.49 Gain(loss) on machinery and equipment disposal (12.87) - Finance Costs 21.34 23.25 Net Profit (10.11) 125.97 Earnings per share (Baht) (0.025