installation of the production line and the testing of the production line in respect of the installation of the entire production line, which was installed successfully. In July 2020, the results of the
steam boiler and balance of plants including manufacturing and installation 3. Registered Capital: 25,000 EUR or equal to 901,052.50 Baht (Average selling rate on 4th April 2019: 36.0421 Baht per Euro
Baht 280.97 million to Baht 292.59 million. Revenue from Installation work also decreased by 50.75%, as the sub-contracting project nearly complete. Cost of goods sold increased 4.84% in portion of
increased 27.8% resulted revenue from metal business and installation work increased the total profit for 9 month period of 2017 was Baht 70.24 million, an increase of 195.8% or Baht 23.75 million over the
Baht by 10.11%. Revenue from Sales increased in material product group and used construction equipment 5.17 million Baht by 6.28% from Baht 82.26 million to Baht 87.43 million. Revenue from Installation
(Decreased) Percentage Remark Sales and Services Income 767.83 551.41 216.42 39.25% - LPG Trading 188.21 187.25 0.96 0.51% - Transportation 3.70 3.58 0.12 3.35% - Conversion Kit Installation 0.62 1.21 (0.59
% increase and revenue from service income increased by THB 0.80 million or equivalent to 131.23% increase, resulted from the increase in installation work and contract work from retail customers. Revenue from
(Decreased) Percentage Remark Sales and Services Income 759.69 563.95 195.74 34.71% - LPG Trading 179.14 189.69 (10.55) (5.56%) - Transportation 3.94 4.72 (0.78) (16.53%) - Conversion Kit Installation 0.62
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Production and Installation machine business. 2. Eureka Design International Pte,.Ltd. (Singapore) , Investment in overseas business. This disposition is considered as the assets disposition transaction of