1 / 3 IR.031/2020 13 August 2020 Re: Notification of the changes of the Profit and Loss Statement To President The Stock Exchange of Thailand We, T Engineering Corporation Public Company Limited (the
Ranking CCET CAL-COMP ELECTRONICS (THAILAND) PUBLIC CO., LTD. Filing FinancialStatement 56-1 56-2 Ranking CEN CAPITAL ENGINEERING NETWORK PUBLIC COMPANY LIMITED Filing FinancialStatement 56-1 56-2 Ranking
PROM METAL PUBLIC COMPANY LIMITED Filing FinancialStatement 56-1 56-2 Ranking PLE POWER LINE ENGINEERING PUBLIC COMPANY LIMITED Filing FinancialStatement 56-1 56-2 Ranking PSTC POWER SOLUTION
. Plus, the Company purchased equipment and made debt repayment in an amount of 14 million Baht. During the year, the Company obtained dividend from other long-term investments and investment in joint
assets and non-current assets amount of Baht 495 million or 42.2% of total assets. The main compositions of assets were property, plant and equipment amount of Baht 339 million or 28.9%, inventories amount
. Nature of operations of the Group The Group has principally engage in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system
distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which dialysis services for kidney patients
from sales and service 1,190.0 1,640.7 1,216.8 (450.7) (27.5) (26.8) (2.2) Rental income from equipment for lease 80.6 79.9 54.5 0.7 0.9 26.1 47.9 Gain on sales of investment - - 108.6 - - (108.6) (100.0
progress which is on process of finalisation of equipment specification and layout designing. The project has the scheduled COD by September 2020. Sisophon, solar project in Cambodia, with an installed
, 2018 to Baht 110,161 million as of March 31, 2019, primarily due to an increase in property, plant and equipment, and intangible assets. • Total interest-bearing debts increase 4.4% from Baht 58,173