first quarter of 2020, the total remaining backlog was THB 9,542mn, decreasing by 7.6% compared to THB 10,324mn at the end of 2019 from the value transferred of 6 ready-to-move-in projects namely (i) The
Microsoft Word - MDA 2017 EN SET Final.docx Page 1 of 5 L-WAVE ENT 28/2018 28 February 2018 Subject: Report on reasons of change to profit (loss) and analysis on operating results by the
outbreak, especially on export, tourism and industrial sector. However, economic recovery has been high uncertain from new wave of the COVID-19 pandemic since December 2020. As a result, the domestic tourism
outbreak, especially on export, tourism and industrial sector. However, economic recovery has been high uncertain from new wave of the COVID-19 pandemic since December 2020. As a result, the domestic tourism
% (y-y) in the first quarter. The main supporting factors were the return-to-expansion of export goods and private investment. On the other hand, the third wave of the COVID-19 pandemic continues to
from (1) and (2), it has been found that the Company still has high limitation. Hence, the Company has studied the possibility to move the location of the project to reduce the distance for raw material
Meteorology was expected that the total rainfall in the Eastern part of Thailand will be higher than average by about 15% in May, and move closing to the average level in June. The average water in the
from (1) and (2), it has been found that the Company still has high limitation. Hence, the Company has studied the possibility to move the location of the project to reduce the distance for raw material
through the acquisition of Multi Sign Company Limited (“Multi Sign”) and Comass Company Limited (“Comass”). This strategic move enabled us to jump our media coverage nationwide and gather wider audience
water quantity of the past 10 years. The weather forecast of the Department of Meteorology was expected that the total rainfall in the Eastern part of Thailand will be move closing to the average in July