buildings of BFTZ from the date of registration until 22 December 2039. The Trust will enter into sub-lease agreement with CBP. The assets to be invested by the Trust consist of total area of 128-1-90.27 rai
installation of telecommunication network and signal equipment. Related technology business In 2018, the Group generates revenue of Baht 1,858 million from related technology business, which is increased by Baht
labor’s cost at the initial stage for training and development of the employee’s skill resulting the high manufacturing cost at the initial stage. If the Company reach the Optimum Level and the installation
to be continuously trained and developed their skills. This resulted in the production cost in the first period remained high. When reaching the optimum level and the installation of some machines is
(Decreased) Percentage Remark Sales and Services Income 2,277.55 1,925.12 352.43 18.31% - LPG Trading 773.68 773.35 0.33 0.04% 1 - Transportation 15.98 12.01 3.97 33.06% 2 - Conversion Kit Installation 4.62
contracts as Subcontractor such BangPa-Kong LNG Terminal Phase 3 project (Design, manufacture, and installation of liquid gas storage tanks) the contract value of 204.12 Million Baht, and Olefins
Baht 100 per share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total
period last year, which was driven by SSSG of 6.8% in our hardline retailing in Thailand category, and the introduction of new merchandise and the installation of in-store amenities such as air
Sales and Services Income 720.81 766.32 (45.51) (5.94%) - LPG Trading 108.72 188.21 (79.49) (42.23%) 1 - Transportation 3.90 3.70 0.20 5.41% - Conversion Kit Installation 0.34 0.62 (0.28) (45.16
Ayutthaya province. A total area of 262-1-71 rai (Less is devoted to the public interest, the remaining area of 0-2-50 rai valuation of 261-3-21 rai or 104,721 square meters, was not indivisible unit