equipment. Implementation of measures during service hours, all service employees must wear masks, face shields and gloves. Also passing through the screening process to check the temperature before perform
and dispose of hazardous waste through high temperature power plant(s) as well as to generate and sell electricity. ART is currently in the process of conducting a feasibility study regarding this plan
per the contract whereas there was a significant decrease of the non-current asset of the mortgage cash at bank of Baht 7.34 million due to the withdrawal of non- mortgage cash at bank. Total
previous year as the revenue recognition on progress measurement method towards complete satisfaction of the performance obligation on construction service contract that has continuously awarded since 2018
cash equivalents 4.36 31.33 (26.97) (86.08) Trade and other current receivables 222.38 186.08 36.30 19.51 Contract assets 574.30 564.88 9.42 1.67 Inventories 20.35 9.72 10.63 109.39 Other current assets
Microsoft Word - 2009-037EN The Information of the Connected Transaction (Additional) Ref.No.2009/037EN September 22, 2020 Subject Inform about The Connected Transaction of the contract of land lease
/2018, the company already had a renew contract from the main repeat customer who requested the company to prepare the training courses, uniforms and all security equipment for the hired employees. While
receivables 2,018.8 1,960.3 58.5 3.0 Contract assets 964.1 905.4 58.7 6.5 Equipment for lease 271.1 300.5 (29.4) (9.8) Total Assets 6,726.9 6,581.5 145.4 2.2 Assets As of March 31, 2024, the Company’s total
forecourt to wear medical masks at all times, inquiries and observations are made along with body temperature measurements of employees are consistently carried out, provide alcohol gel for cleaning hands at
amount (CBM/Day) Maximum purchase amount (CMB/Day) Price VAT included (Baht/CBM) Year 1-3 12,000 15,600 9.90 throughout contract validity Year 4-7 13,200 17,160 Year 8-10 14,400 18,720 Contract term of 10