buildings of BFTZ from the date of registration until 22 December 2039. The Trust will enter into sub-lease agreement with CBP. The assets to be invested by the Trust consist of total area of 128-1-90.27 rai
electricity in 2022. Information of solar power plants in Japan : Details of the Company’s 8 solar power plants in Japan are as follows: 1) Kuno Solar Power Plant Location : Kuno City, Ibaraki Prefecture, Japan
from sale of electricity in 2022. Information of solar power plants in Japan : Details of the Company’s 8 solar power plants in Japan are as follows: 1) Kuno Solar Power Plant Location : Kuno City
as follows: 1) Kuno Solar Power Plant Location : Kuno City, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW - 14 - Feed-in Tariff (FiT) : 36 JPY / kWh Commercial
period until the applicant has corrected the application or submitted additional documents fully according to the record of defect. (Unofficial Translation) 2 Service Channel Location: The Securities and
Ayutthaya province. A total area of 262-1-71 rai (Less is devoted to the public interest, the remaining area of 0-2-50 rai valuation of 261-3-21 rai or 104,721 square meters, was not indivisible unit
Center and sold an additional exhibition area as well as selling advertising media in all area with total revenue of Baht 119 million, compared to 2017, which had total revenue of Baht 108 million. In
SITUATION Thailand economic situation in Q4/2019 in Central and Eastern area were contracted compared to the same period of 2018 due to global economic and domestic consumption weak, that were impacted from
Land with structure of J Condo Rama 2 Project locate at Samae-Dam, Bang Khun Thian, Bangkok 1) Title deeds no. 168123 area 264 square meters. 2) Title deeds no. 177598, 177599, 177600 with a total area
Connected transaction related to asset acquisition. 4.3 Details of asset a. Two units of clean room equipped with the air conditioning system having a total area of 1,039 square meters. b. One unit of