1 No. ECF2 029/2561 28 June 2018 Subject The Entering into an Investment of the construction of the Manufacturing Plant and Distributing of the Medium Density Fiber Board or MDF Board in Narathiwat
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
and continuous raining as well as the increase of Independent Power Supply (IPS) and Small Power Producer (SPP) outside the EGAT system. In the meantime, electricity consumption of the country in EGAT
, an increase of 9.9% yoy from net loss of THB 55 million in 3Q17. In 9M18, net profit was THB 170million, an increase from net loss of THB 23million in 9M17, mainly driven by the continuous growth of
. However the increase of total revenue came from the significant growth of other income from selling waste and material. 2. Cost of goods sold and expenses : Consolidated Unit: Million Baht Information of
same period of a year earlier. The main reasons was the regular increase in sales and administrative expenses while gross margins amount stay flat in the current quarter, despite higher in sales but
Reported 94,224.83 96,391.09 Derivative Assets Increase / (Decrease) 143.51 488.56 Investments in Associates and Joint Ventures Increase / (Decrease) (573.93) (785.71) Total Assets - Restated 93,794.41
scheduled in the fourth quarter of 2020. - Yunlin Project (The project), a project of Yunlin Holding GmbH (Yunlin) (EGCO holds a 25% ownership interest), is an offshore wind farm power plant project which
Projects under construction - Yunlin Project (The project), a project of Yunlin Holding GmbH (Yunlin) (EGCO holds a 25% ownership interest), is an offshore wind farm power plant project which located in the
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and