in full; (2) provision that the unitholders who express their intention to purchase or invest in the investment units of this mutual fund, regardless of which phase, shall be deemed to have accepted
unitholder who has declared the intention to purchase or invest in the investment units of the mutual fund according to the mutual fund scheme, regardless of which phase of ownership, shall be deemed to have
under its 50-year concession with the total generating capacity of 48,000 cubic meters per day. The generating capacity is divided into 2 phases; Phase 1 commenced its operation in December 2018 at 24,000
ทนุในงาน โครงการขนาดใหญ่หลายโครงการ เช่น โครงการซือ้และติดตัง้ระบบคลาวดข์อง กสท.โทรคมนาคม โครงการจา้งงานดา้น เทคโนโลยีสารสนเทศและการสื่อสารอาคารรฐัสภาแห่งใหม่ ทัง้ Phase I และ Phase โครงการขายพรอ้มติด
or 15% from 2017 because Bangpa-In Cogeneration Company Limited Phase 2 (BIC2) had started COD in June 2017 and higher income from the concession according to TFRIC12 of Nam Lik 1 Power Company Limited
or 15% from 2017 because Bangpa-In Cogeneration Company Limited Phase 2 (BIC2) had started COD in June 2017 and higher income from the concession according to TFRIC12 of Nam Lik 1 Power Company Limited
affected the total marketing margin, and the increasing investment in Non-Oil businesses; which is in the developing phase of its infrastructure and location expansion, thus incurring high Selling, General
currently in the process of rectifying its status to be removed from possible delisting by the SET. Currently, the company is stage of repossession of qualifications in order to resume trading ( Resume Stage
international airports (Suvarnabhumi – Don Muang – U-Tapao), Laem Chabang Port Phase III, Map Ta Phut Industrial Port Phase III, Sattahip Commercial Port, and the connection of railway networks with the three
890 854 9% -4% 2,327 2,542 9% Electricity Sales (Million kWh) Solar Power Business – Thailand Phase 1-3 (130 MW) 61.01 62.67 60.69 -1% -3% 191.38 186.70 -2% Cooperative Solar Project (12 MW) N/A 5.40