Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Installation 2.06 4.62 (2.56) (55.41%) 2 - Construction 2,228.33 1,405.03 823.3 58.60% 3 - Testing and Inspection 88.53 78.24 10.29 13.15% Cost of sales and services (2,778.79) (2,029.13) 749.66 36.94% Gross
Group approximately has 15,000 employees; this reflects the Group’s potential for future expansion of FTTx service offering to cover everywhere nationwide; in addition to enabling rapid installation and
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
. Nature of operations of the Group The Group has principally engage in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system
competitors entering to the market, and invested in assets in order to receive privileges under investment promotion schemes granted expenditure reduction around 1.5 times. The installation of kiosk takes
competitors entering to the market, and invested in assets in order to receive privileges under investment promotion schemes granted expenditure reduction around 1.5 times. The installation of kiosk takes
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
from the previous quarter has been completed and their work can be delivered such as the New Parliament Project in Information and Communication Technology, the Trading and Installation Project for the