in the business operation. Currently, GSTEL is in the process of obtaining loan facilities from the new lender. Upon the funding completion, the short term loan will be promptly repaid by GSTEL. Total
the rights under the agreements to Mr. Arak Suksawad as follows: 3.1 Rights under the Loan Agreement dated 26 December 2016 between the Company as a lender and Inter Far East Energy Corporation Public
: Estimated transaction date by January 17, 2018. 2. Connected Parties: Lender: Cal-Comp Optical Electronics (Suzhou) Co., Ltd (“CCOS”) Borrower: XYZprinting (Suzhou) Co., Ltd. (“XYZ-Suzhou”) 3. General
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
Rajchapluek Engineering Company Limited Non-Destructive Testing and Inspection services Paid-up Capital 20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Transportation Service Paid-up Capital 15
Equipment Transportation Service Paid-up Capital 15 Mil.Baht TAKUNI holds 99.99% Takuni (Thailand) Company Limited LPG/CNG conversion kit installation and LPG system construction Paid-up Capital 50 Mil.Baht
Equipment Transportation Service Paid-up Capital 15 Mil.Baht TAKUNI holds 99.99% Takuni (Thailand) Company Limited LPG/CNG conversion kit installation and LPG system construction Paid-up Capital 50 Mil.Baht
Aukkrarawat may consider retrieving the waste water from such new projects if it takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located
projects if it takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to