purchase order for slit of steel. In addition, the Company recognized more inventory in-transit which not made a payment in abroad trade payables. Non-Current Liabilities The Company’s non-current
with plan, even though some stores in Bangkok are still affected by the construction of mass transit projects. The extended period of hot weather in many areas during April and May, where temperatures
goods in transit as of December 31, 2018 which was imported according to purchase orders and delivered to customer in January 2019. Total Liabilities was Baht 1,860.04 million, decreased Baht 868.59
1,002.80 million consisted of; 1. Trade and other receivable decreased Baht 138.67 million. 2. Inventories decreased Baht 828.53 million, mostly from goods in transit as of December 31, 2018 which was
materials. Increased in inventories of THB 45.76 million, mainly due to goods in transit for THB 22.58 million. Increase of right-of-use assets (ROU) for THB 302.57 million which is acknowledged for lease
Concession Contracts including of the obligation for extensions of the MRT Pink Line Project and the MRT Yellow Line Project with Mass Rapid Transit Authority of Thailand ("MRTA"). The MRT Pink Line Project
higher than MACO’s Domestic Advertising segment due to higher cost from concession in Transit and Airport media. As a result, overall gross profit margin was decreased from 34.4% to 24.0%. Selling, General
remaining strong. Rotterdam PTA expansion required a tie-in shutdown lowering PTA production by 45KT. European market is displaying strength which continues in 3Q17 therefore the doubling of PTA output to
TRANSIT SYSTEM PUBLIC COMPANY LIMITED BANGKOK POST PUBLIC COMPANY LIMITED BANGKOK RANCH PUBLIC COMPANY LIMITED BANGKOK SHEET METAL PUBLIC COMPANY LIMITED BANGKOK SYNTHETICS COMPANY LIMITED BANGKOK UNION
fully transferred. While, ESCENT VILLE Chiangmai, ESCENT Chiangrai, ESCENT Nakhon Ratchasima and PHYLL Pahol 34 have been completed the construction and under transfer process to customers. • Residential