Supervisory Board. This liability arises from her failure to issue orders or perform the duties required to ensure compliance with the specified regulations, resulting in JCT’s delayed submission of the report
cubic meter per day and initial order of 4,000 cubic meter per day WHA NGD 4 (Natural Gas Distribution), a installed capacities of Million 2,000,000 BTU per year, representing Million 700,000 BTU equity
Toei District Administrative Organization which is a water pipe 900 mm. laid on public area, the road behigh the temple Moo.1 Na Toei District, ampher Taymueng, Phanga Province. Length 350 meter. 6
water pipe 900 mm. laid on public area, the road behigh the temple Moo.1 Na Toei District, ampher Taymueng, Phanga Province. Length 350 meter. 6. Permit piping and pressure piping : No.kor.kor.0638/2023
. Length 350 meter. 6. Permit piping and pressure piping : No.kor.kor.0638/2023/8809 dated December 17, 2015 issued by Department of Highways which is water pipe 900 mm. and pressure pipe in the highways
120 million cubic meter At the Eureka Design Public Company Limited board meeting, 3/2020, dated March 12, 2020, the board approved the investment in water production and sales to the Provincial
amount of Baht 12.72 which is higher than the same period of previous year and property, plant and equipment decrease by Baht 4.96 million, because of the depreciation. 2. Total liability, the company had
contract) the rental and service fee is about 130 baht per square meter per month(excluding utilities). The lessor and the asset owner is Mrs. Dhanawan Dhanasuwiwath (Previous name and surname : Mrs
rent rate of Baht 400 per square meter per month is deemed to be the common rate in the ordinary course of business. The common and public utility fees at the rate of Baht 277 per square meter per month
meters with monthly rental fee of 150 THB per square meter 1.1 Land Lease Agreement with Factory and Office Building (cont.) : Office building area 200 square meters with monthly rental fee 150 THB per