Energy Services Co.,Ltd. (Paju ES) (EGCO holds a 49.00% ownership interest), located in Gangdong-gu, Seoul, South Korea with a capacity of 19.80 MW. Gangdong will sell electricity to Korea Electric Power
Public Co., Ltd. (EPCO) for Q1/2019 is Baht 46.78 million in comparison with net profit of Baht 149.49 million for the same period previous year, a decrease of Baht 102.70 million or 68.70%. Such amount
percent to 100 percent. 1.4 The Collapse of the Saddle Dam of Xe-Pian Xe-Namnoy Hydroelectr ic Power Project On July 23, 2018, the Saddle Sam D of Xe-Pian Xe-Namnoy Hydroelectric Power Project, located in
ES) (EGCO holds a 49.00% ownership interest), located in Gangdong-gu, Seoul, South Korea with a capacity of 19.80 MW. Gangdong will sell electricity to Korea Electric Power Corporation (KEPCO), the
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
Cogen, with the installed capacity of 115 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province. TJ Cogen has entered into the PPA with EGAT for 25 years with
cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province. The project has entered into
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
Xe-Namnoy Hydroelectric Power Project, located in Champasak district, Lao PDR, of Xe-pian Xe-Namnoy Power Company Limited (“PNPC”), a joint venture which the Company holds 25 percent stake, collapsed
decrease of THB 8.5 Mn or 24.3%. This decrease was mainly due to the Group had other income from the reversal of the provision for decommissioning costs of THB 17.3 Mn in the 2nd quarter of 2018. However