agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management
Limited entered into an extension of the concession agreement with the Expressway Authority of Thailand ( EXAT) on July 19, 2017 for the construction of the Connection between the Si Rat-Outer Ring Road
Expressway and Metro Public Company Limited (“the Company”) was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) with total of Baht 10,000 Million with floating interest rate
Asset 2.14 0.5% 3.01 1.4% 0.87 40.7% Non-Current asset 587.39 47.9% 635.36 49.3% 47.97 8.2% Total Asset 1,225.98 100.0% 1,276.51 100.0% 50.53 4.1% Liability Current liability 77.35 6.3% 85.75 7.6% 8.40
million and increase in property, plant and equipment by Baht 15.99 million, due to the investment in machinery of new production lines. 2. Total liability, the company had total liability as at September
which have not yet recovered. The high liability affected the expense atmosphere to be sluggish. Cost of goods sold was 641.29 million baht or equivalent to 50.31% gaining from sales revenue which it
annual depreciation calculation. 2. Total liability, the company had total liability as of December 31, 2019 at 79.68 million bath decrease from December 31, 2018 at 22.05 million bath or 21.67% decrease
calculation. 2. Total liability, the company had total liability as of March 31, 2019 at 110.47 million bath increase from December 31, 2018 at 8.74 million bath or 8.59% increase, the details of the change are
problem of purchasing power and incomes which have not yet recovered. Furthermore the liability stayed in high level and this was slightly speeded up the consumption. Therefore, it affected the expense