scheduled to achieve Commercial Operation Date in January 2018. WHA ESIE 4 water treatment plant achieved COD in January 2018 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500
Reclaimed Water Project Phase 2 (RO) at WHA EIE is scheduled to achieve COD in 2Q2019 with capacity of 2,500 cubic meter per day. WHAUP Nghe An Vietnam Project is scheduled to achieve COD in 3Q2019 with
. Significant Events: Reclaimed Water Project (RO) at WHA EIE achieved Commercial Operation Date in July 2018 with capacity of 7,500 cubic meter per day or 2.7 million cubic meter per year. PERFORMANCE BY
Road Bangmod Jomthong Bangkok 10150 in total rental area of 4,950 square meter. The term of lease is 3 years starting from August 1st 2018 - July 31st 2021. Transaction Objective : To lease office space
transaction The rental rate is 130 baht per square meter per month. (Only the usable area of the building is 6,594.09 square meters.) or 10,286,780 baht in one year. The rental rate will increase not more than
cumulative tax losses can be used. In the year 2017 : Asset and liability, there were current asset 445.02 Million Baht increased 141.42 Milllion Baht from 2016, as the result of cash flow from operation and
year was from 6.27 times to 5.52 times because the Company has current liability increasing from the same period of last year. Receivable Turnover changed little from the last year, from 1.10 times to
of which significantly affect corporate operating results in terms of profit-loss or liability in each accounting period. After filing the application for fund establishment, additionally, proposed
Toei District Administrative Organization which is a water pipe 900 mm. laid on public area, the road behigh the temple Moo.1 Na Toei District, ampher Taymueng, Phanga Province. Length 350 meter. 6
water pipe 900 mm. laid on public area, the road behigh the temple Moo.1 Na Toei District, ampher Taymueng, Phanga Province. Length 350 meter. 6. Permit piping and pressure piping : No.kor.kor.0638/2023