. Currently, the status of the project is pending for the construction license approval process of the project, which delays due to a change in policy on procedure and the license approval process of the
transferred in this quarter, having lower land and construction costs. Utilities & Power Business Q2 2016 Q2 2017 Increase/(Decrease) THB mm THB mm THB mm % Revenue 500.2 495.7 (4.5) (0.9%) Gross Profit 205.4
of long-term loans from bank, payment for the construction of the headquarter, training and distribution center and the expansion of the factory and new branches. Page 4/5 Short-term Investment As at
x Total issued and paid-up shares) + (Right Offering price x Total newly issued shares) Total issued and paid-up shares + Total newly issued shares http://www.setsmart.com)/ 4/7 เลขท่ี 1 อาคาร ทีพี
million respectively. The decrease of THB 576.71 million was mainly due to the investment in short-term investment, repayment of long-term loans from bank, payment for the construction of the headquarter
Public Company Limited (“TSE”) of 181.75 million shares, which represents 10.01% of issued and paid- up shares of TSE at the total value of 925.11 Million Baht or 5.09 Baht per share to Miss Cathleen
capacity and took advantage of our increased capacity to maximize production in anticipation of a strong sugar season. The fourth quarter was even stronger than forecasted with volumes up over 30% in
does not have transmission lines but it is the wide-open area considered to have potential to set up the power plant. Nevertheless, it needs to invest in the construction of additional transmission lines
ไว้ข้างต้น เช่น ธ.Bank of China (BOC), ธ.Industrial and Commercial Bank of China (ICBC), ธ.Industrial and Commercial Bank of China Asia (ICBC Asia), ธ.Bank of East Asia (BEA), ธ.China Construction Bank
บริการอ่ืน (Fabrication and Other Service) 137.77 9.93 22.55 2.21 รวมรายได้บริการรับเหมาก่อสร้าง (Total construction service income) 1,387.08 100.00 1,019.29 100.00 ในปี 2561 กลุม่บริษัทยงัคงมสีดัสว่นราย