Period As Of Details EUREKA DESIGN PUBLIC COMPANY LIMITED 2023 Reviewed Consolidated Q2 30/06/2023 EUREKA DESIGN PUBLIC COMPANY LIMITED 2023 Reviewed Company Q2 30/06/2023 EUREKA DESIGN PUBLIC COMPANY
. Mr.Ngiam soon Hui Group Company Structure (before transaction) OPERATE IN DESIGN, ASSEMBLY AND INSTALLATION MACHINE BUSINESS OPERATE IN DESIGN, ASSEMBLY AND INSTALLATION MACHINE BUSINESS OPERATE IN
. Mr.Ngiam soon Hui Group Company Structure (before transaction) OPERATE IN DESIGN, ASSEMBLY AND INSTALLATION MACHINE BUSINESS OPERATE IN DESIGN, ASSEMBLY AND INSTALLATION MACHINE BUSINESS OPERATE IN
follows: 1. Name of Joint Venture Company : SCHNEIDER-KESSEL Energysystems GmbH(SKE) will be registered and located in Federal Republic of Germany 2. Nature of Business: to provide engineering design of
for Listed Companies” will be provided for all listed companies. In this regard, the working group approved the Faculty of Law, Chulalongkorn University, to prepare and design the structure of the
tower, design and distribute steel structure according to the drawing, power distribution and heat energy business, construction and tunneling contractor and distribution of industrial products. In the
Shareholders’ Structure and Shareholding Proportion of a Limited Company or Public Limited Company Which Is Established to Undertake Securities Business in the Category of Securities Finance
-Translation- NO. ED-MD2020-0009 March 12th, 2020 Subject: Notification of Acquisition Assets To: Director and General Manager The Stock Exchange of Thailand Enclosed Report Eureka Design Public
Derivative Warrants | AURA01C2403A | DERIVATIVE CALL WARRANTS ON AURORA DESIGN PUBLIC COMPANY LIMITED ISSUED BY BUALUANG SECURITIES PUBLIC COMPANY LIMITED LAST TRADING IN MARCH 2024 # A | Stock in
Derivative Warrants | AURA13C2403A | DERIVATIVE CALL WARRANTS ON AURORA DESIGN PUBLIC COMPANY LIMITED ISSUED BY KGI SECURITIES (THAILAND) PUBLIC COMPANY LIMITED LAST TRADING IN MARCH 2024 # A | Stock