’ meeting to (1) increase the foreign shareholding ratio to support the allocation of newly issued ordinary shares under the specific objective basis to specific investors (Private Placement) from not
(Thailand) Co., Ltd., capital increase, and the issuance and allocation of the newly issued ordinary shares to the specific person under the private placement basis, and the schedule for Extraordinary General
: ……………………………………...………………….……. ………………………………………………………………………… ………………………………………………………………………… Beta Tracking Error Average Maturity of Debt Instruments Fees to be charged to the fund (% of NAV per annum) Yield to Maturity Fee items Maximum charge Actual charge Country Allocation Management fee
the Company in the long term. Page 6 4. Description of Asset to be Acquired 4.1) General Information The manufacturing plant of MDF Board has a capacity of 652 cubic meter per day or 195,600 cubic meter
manufacturing plant of MDF Board has a capacity of 652 cubic meter per day or 195,600 cubic meter per year, located in Yi-ngor district, Narathiwat Province, near the raw material resource in 3 southern border
use water more efficiently, and jointly set a demand reduction of 10% during the drought 2. Control water withdrawal from Dokkrai and Nongplalai Reservoirs to not exceed 600,000 cubic meter per day (CMD
to not exceed 600,000 cubic meter per day (CMD) to maintain the water level in the reservoirs above the dead storage 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs
according to the proportion of income according to the specified plan In addition, the company has measured fair value of PPA (Perchase Price Allocation) of WICE Logistics (Hong Kong) with intangible assets
of the investors from within October 31, 2018 to be on November 30, 2018. 2) Adding information relating to investors, shareholding structure before and after the allocation of newly-issued ordinary
เม้นท์ จ ากดั (APM) - หน้า 12 - area temple Moo.1 Na Toei District, ampher Taymueng, Phanga Province. Length 350 meter. 6. Permit piping and pressure piping : No.kor.kor.0638/2023/8809 dated December 17