are engineering, construction,and installation of electrical and control systems. The Company has also been providing operation and maintenance services to offshore and onshore https://market.sec.or.th
. Currently, the construction of the factory building, and machine installation has been partially completed. Anywise, the company had to repay loans and interest regularly. 7. The performance of the company
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
installation capacity 7.5 MW of Prize of Wood Green Energy at Narathiwas Province which this project is held 99.99 percent of total shares by SAFE. The Company could gain profit sharing from the 1st Quarter 2018
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
? shares, construction contracts, machinery procurement and installation contracts, as well as misuse of NE and ESES whose controlling person was Bhusana as a channel for committing fraudulent acts in many
. Conducting an consultancy service regarding the project management and development, fund raising, procurement and installation, construction, examination and operation to an individual, juristic person
of operations of the Group The Group has principally engage in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system
Automotive Private Limited, and Ford. Name Sakthi Global Auto Holdings Limited (“SGAH”) Date of Registration 10 April 2017 Head Office’s Location Suite 1, 3rd Floor, Acorn House, Great Oaks, Basildon, England
Auto Holdings Limited (“SGAH”) Date of Registration 10 April 2017 Head Office’s Location Suite 1, 3rd Floor, Acorn House, Great Oaks, Basildon, England, SS14 1AH, the United Kingdom Capital Structure