result. Dear sir, We, Unimit Engineering Public Company Limited (UEC) , would like to clarify the change in operating result for Q2/2019 which changing over 20% from the same period last year as follows
result. Dear sir, We, Unimit Engineering Public Company Limited (UEC) , would like to clarify the change in operating result for Q2/2018 which changing over 20% from the same period last year as follows
the full effect of Saraburi Quicklime addedon March 19th. Similar to Q1 2018, the revenue was from core business, that is a major shift compared with H1 2017 when the contribution of Engineering was a
increased 121.20 million baht or 11% from 1,111.90 million baht in the nine months of year 2017 to 1,233.10 million baht in the nine months of year 2018. The main increase was derived from the engineering
engineering. A similar impact is seen year to date where core business is running well beyond the same period in 2017 while the impact from lack of engineering contribution is a drag. We do expect Golden Lime
to steadily pass through this challenging year. In addition, the company also has a new joint venture partner, GS Engineering and Construction Corporation (GS E&C) from South Korea which is a top
Subject : Clarification of the operating result. Dear sir, We, Unimit Engineering Public Company Limited (UEC), would like to clarify the change in the operating results for Q2/2020 which has had a change
PUBLIC COMPANY LIMITED Disposition Stock 68.4285 68.4285 0 09/12/2020 69.2208 69.1785 0.0423 246007852012-1 OTO THE SAMART ENGINEERING COMPANY LIMITED Disposition Stock 0.75 0.75 0 09/12/2020 69.2208
innovation and technology, especially in the engineering and material fields, the company will gain advantage in accessing those information to improve the company’s products and generate more income in the
: Clarification of the Operating Results Dear sir, We, Unimit Engineering Public Company Limited (UEC), would like to clarify the changes in the operating results for Q1/2020, which has changed by 20% from the same