there was an increase in short-term financing facilities overall financing costs have reduced as the long-term loan is repaid. Income tax was higher due to an increase in the topline and a decrease in the
-tax earnings compared to the same period in 2017. As a combined effect of higher depreciation, financing costs, and taxation, the EBITDA increase did not translate fully into net result in the same
) head south around 70 meter in Kwang Ban Chalong, Khet Bang Pli, Samutprakan with area according to title deed of 19 rai, 1 ngan, and 40 square meter. Currently is the Printing plant and Distribution
Associates or Joint Ventures. Projects under Construction Utilities WHA ESIE 3 water treatment plant is scheduled to achieve COD in 1Q2020 with capacity of 3,600 cubic meter per day and wastewater treatment
ESIE 3 water treatment plant is scheduled to achieve COD in 1Q2020 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day. WHAUP Nghe An Vietnam water
our higher interest rate borrowings (note that the financing costs of BIP1 and BIP2 is 5.6% p.a. for fiscal year end 2017). Acquisition of BGYSP BGRIM acquired additional of 51% shares of B.Grimm Yanhee
Company Limited Investment in water production and sales project for the amount of 113.88 million cubic meter At the Eureka Design Public Company Limited board meeting, 3/2020, dated March 12, 2020, the
in 2017, primarily due to improvement of our operating profit margin and significant reduction of financing cost resulting from the repayment of loan after IPO. • NNP margin improved to 9.3% in 2017
(CFO) 124.69 200.84 Cash Flow from Investing (CFI) (708.67) (123.10) Cash Flow from Financing (CFF) 626.00 (54.16) Decrease in translation adjustments (0.14) (0.39) Net increase (decrease) in cash and
200.06 Cash Flow from Investing (CFI) (123.10) (62.03) Cash Flow from Financing (CFF) (54.16) (87.48) Decrease in translation adjustments (0.40) (2.41) Net increase (decrease) in cash and cash equivalents