540.30 341.86 198.44 58.05 - Fabrication and Other service 281.46 137.77 143.69 104.30 Cost of construction contracts (1,851.87) (1,241.09) 610.78 49.21 Gross profit 182.59 145.99 36.59 25.06 Other income
Services) 228.47 162.77 65.70 40.36 519.87 315.33 204.54 64.87 - Civil & Building Service 212.36 114.95 97.41 84.74 414.43 215.72 198.71 92.11 - Fabrication and Other service 116.03 92.93 23.10 24.86 209.25
- Fabrication and Other services 41.42 39.91 1.51 3.78 254.14 48.31 205.83 426.06 Cost of construction contracts (447.80) (311.70) 136.10 43.66 (1,308.05) (955.05) 352.99 36.96 Gross profit 48.34 33.17 15.17
. Page 11 - On September 25, 2019, EGCO has entered into the Shareholder’s Agreement of Thai Pipeline Network Company Limited (TPN) to acquired 44.60% ownership interest. TPN operates oil transportation
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
Rajchapluek Engineering Company Limited Non-Destructive Testing and Inspection services Paid-up Capital 20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Transportation Service Paid-up Capital 15
Aukkrarawat may consider retrieving the waste water from such new projects if it takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located
projects if it takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to
such new projects if it takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their