from the contributions of 1) additional industrial users with total PPA of 25 MW, 2) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively
performance of gas turbine [to lower the heat rate of the power plant, shorten the maintenance period (or add operating days) by 5-10 days and add capacity by 7 MW], its efficiency improvement was already
increase in revenue from transportation of Baht 5.26 million and increase in revenue from services of Baht 29.62 million. Other revenue was Baht 13.68 million, which increased from the same period of
allowance for asset impairment amounting to Baht 31 million for Combined Heat and Power Producing Company Limited (CHPP) to be disposed. When comparing to Q1/2017, non-operating income and expenses decreased
the agreement with PTTPL to be EPC for solar rooftop and BESS project On 13th July 2018, Combine Heat and Power Producing Company Limited (CHPP), in which GPSC has hold 100% stake, has signed the
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
Rajchapluek Engineering Company Limited Non-Destructive Testing and Inspection services Paid-up Capital 20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Transportation Service Paid-up Capital 15
Equipment Transportation Service Paid-up Capital 15 Mil.Baht TAKUNI holds 99.99% Takuni (Thailand) Company Limited LPG/CNG conversion kit installation and LPG system construction Paid-up Capital 50 Mil.Baht
Equipment Transportation Service Paid-up Capital 15 Mil.Baht TAKUNI holds 99.99% Takuni (Thailand) Company Limited LPG/CNG conversion kit installation and LPG system construction Paid-up Capital 50 Mil.Baht