in the amount of 161.2 million baht, and leasing-back 28 percent of the rental area from the Fund.The independent financial advisor viewed that the transactions are inappropriate on the ground that the
by holding percent of total shares, invested to solar power plant with installation capacity 1.5 MW at Himeji Prefecture, Japan by holding 51% of total shares of the project and later this project was
planning for pipe installation system and providing High Density Polyethelene (HDPE) pipe installation service and water management. On 8 March 2017, increased the issued and paid-up shares from 50 million
Remark Sales and Services Income 686.15 582.93 103.22 17.71% - LPG Trading 195.57 186.44 9.13 4.90% 1 - Transportation 4.18 4.00 0.18 4.50% - Conversion Kit Installation 0.37 0.68 (0.31) (45.59%) 2
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Remark Sales and Services Income 582.93 361.15 221.78 61.41% - LPG Trading 186.44 190.36 (3.92) (2.06%) 1 - Transportation 4.00 2.44 1.56 63.93% 2 - Conversion Kit Installation 0.68 1.56 (0.88) (56.41%) 3
(Decreased) Percentage Remark Sales and Services Income 563.95 485.78 78.17 16.09% - LPG Trading 189.70 178.97 10.73 6.00% 1 - Transportation 4.72 3.29 1.43 43.47% 2 - Conversion Kit Installation 1.34 1.74
share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total project value
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System