(%) Income from sale and installation of the pipeline 255.35 260.76 (2.07) Income from water business 47.53 72.10 (34.08) Other income 25.90 4.19 518.14 Total revenues 328.78 337.05 (2.45) Cost from sale and
Champasak district, Lao PDR, of Xepian Xe-Namnoy Power Company Limited (“PNPC”), a joint venture which the Company holds 25 percent stake, collapsed. The Saddle Dam fractured which caused the water to flow to
and installation of the pipeline 239.05 248.60 (3.84) Income from water production and distribution 31.25 24.31 28.55 Income from installation and distribution of water production systems 3.40 25.03
hour, and chilled water of approximately 12,000 refrigerated tons. Furthermore, the Tender Offeror has the effective capacity for power generation in the power plants which are currently under
or equivalent to 60 percent of the total shares in Oversea Green Energy Company Limited which invests in the project management service of Iwaki-Fukushima and Ueda Solar Power Projects in Japan to the
PUBLIC COMPANY LIMITED EASTERN POLYMER GROUP PUBLIC COMPANY LIMITED EASTERN POWER GROUP PUBLIC COMPANY LIMITED EASTERN TECHNICAL ENGINEERING PUBLIC COMPANY LIMITED EASTERN WATER RESOURCES DEVELOPMENT AND
PUBLIC COMPANY LIMITED EASTERN POLYMER GROUP PUBLIC COMPANY LIMITED EASTERN POWER GROUP PUBLIC COMPANY LIMITED EASTERN TECHNICAL ENGINEERING PUBLIC COMPANY LIMITED EASTERN WATER RESOURCES DEVELOPMENT AND
found that the neighboring communities around project materially retrieve less waste water from the project. Based on the inspection, it was found that (1) there are new power plant projects in the area
of utility services in Q1/2018 compared with those in the same period of 2017, (while utility service income is stable), are attributable to the road and water system repairing cost. ▪ An increasing
quarter of 2017, RATCH-Australia Corporation Company Limited, a subsidiary, received Business Interruption Claim of Starfish Hill Wind Power Plant in the amount of Baht 36.85 million. In addition, in the 3