stocks. 22/12/2022 agreed to comply with civil penalties determined by the Civil Penalty Committee as follows : - a compensation of the benefit received from committing
>23/12/2022 agreed to comply with civil penalties determined by the Civil Penalty Committee as follows : - a compensation of the benefit received from committing the
with the normal market condition. 03/03/2023 agreed to comply with civil penalties determined by the Civil Penalty Committee as follows : - a compensation of the
business to manage and dispose of hazardous waste through high temperature power plant(s) as well as to generate and sell electricity. ART is currently in the process of conducting a feasibility study
and dispose of hazardous waste through high temperature power plant(s) as well as to generate and sell electricity.ART is currently in the process of conducting a feasibility study regarding this plan
contingency operation .[M] 2.3 Temperature and humidity controlling system · Controlling the environment condition which have temperature and humidity appropriately according to settle the temperature of the
computer system form damage of inconsistent electricity. [M] o Providing a preserved electricity system for the important computer system for the purpose of contingency operation.[M] 2.3 Temperature and
Improvement cost Re-design cost, advisor cost, insurance, etc. 608.43 93.72 - - 608.43 93.72 484.64 73.55 123.79 20.17 Sub-total cost Compensation for Loss of production cost 702.15 696.57 - 49.64 702.15 746.21
-design cost, advisor cost, insurance, etc. 608.43 93.72 36.92 - 645.35 93.72 484.64 73.55 160.71 20.17 Sub-total cost Compensation for Loss of production cost 702.15 696.57 36.92 59.75 739.07 756.32 558.19
, increased by 6.63 million baht or 61.77 %. In 2019, the company had accounting record of the increment of compensation according to new labor law. Regarding to the new Act of Labor Protection, the employee