., BANGKAE, BANGKAE, BANGKOK, THAILAND. 10160 Tel: 02-455-2888 Fax: 02-455-2763 (“TRANSLATION”) TG 052/2020 May 11, 2020 Subject: Clarification of the Operating Result for the significant change Attention: The
System Engineering and Service Company Limited (ESES) for the construction of a building and the installation of electricity-generating machinery at the exaggerated price of 58 million baht. Nongree Power
Power Plants Company Limited (a 100-percent subsidiary of IEC) through a contract with ESES for the construction of a building and the installation of electricity-generating machinery at the exaggerated
Limited (a 100-percent subsidiary of IEC) through a contract with ESES for the construction of a building and the installation of electricity-generating machinery at the exaggerated price of 58 million baht
Enterprise (24 percent) and the Company (25 percent). The project is located in Attapeu and Champasak Provinces in Lao PDR. 1.6 Commercial Operation of Diesel Generator Installation Project of the System
Company business operation are engineering, construction,and installation of electrical and control systems. The Company has also been providing operation and maintenance services to offshore and onshore
due to COD of both phases of IRPC-CP and the better performance of Rayong Central Utility Plants as the industrial users are operating normally compared to the maintenance shutdown in Q1/2017. In
., BANGKAE, BANGKAE, BANGKOK, THAILAND. 10160 Tel: 02-455-2888 Fax: 02-455-2763 (“TRANSLATION”) TG 195/2560 November 8, 2017 Subject: Clarification of the Operating Result for the significant change - Update
with the postponement of the Windows 12 operating system launch until mid-next year. Additionally, the company has plans to expand into the solar cell sales and installation business, with an anticipated
Bangkok, May 22, 2015 ? The SEC revised regulations on business operation concerning report of significant change in operating system, suitability test and client asset report.The Capital Market