SINO-THAI ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED SIRAKORN PUBLIC COMPANY LIMITED SIS DISTRIBUTION (THAILAND) PUBLIC COMPANY LIMITED SISB PUBLIC COMPANY LIMITED SITRON POWER PUBLIC COMPANY
SINO-THAI ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED SIRAKORN PUBLIC COMPANY LIMITED SIS DISTRIBUTION (THAILAND) PUBLIC COMPANY LIMITED SISB PUBLIC COMPANY LIMITED SITRON POWER PUBLIC COMPANY
SINO-THAI ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED SIRAKORN PUBLIC COMPANY LIMITED SIS DISTRIBUTION (THAILAND) PUBLIC COMPANY LIMITED SISB PUBLIC COMPANY LIMITED SITRON POWER PUBLIC COMPANY
SINO-THAI ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED SIRAKORN PUBLIC COMPANY LIMITED SIS DISTRIBUTION (THAILAND) PUBLIC COMPANY LIMITED SISB PUBLIC COMPANY LIMITED SITRON POWER PUBLIC COMPANY
. Currently, the capacity is 1,200 tons/year. Therefore, VAVA will not compete with the Company and VAVA will stop production and distribution of flexible packaging products within 3 months from the date that
relied upon as, a promise or representation, whether as to the past or the future and no reliance, in whole or in part, should be placed on the fairness, accuracy, completeness or correctness of the
(1,591,877) / 171,117 = N/A 48.72% x (69,682) / 171,117 = 19.84% 19.84% (Not applicable in the part relating to PP1 because the PP1’s Financial Statements showed the net loss. 3. Total value of consideration
) / 171,117 = 19.84% 19.84% (Not applicable in the part relating to PP1 because the PP1’s Financial Statements showed the net loss. 3. Total value of consideration Total amount paid/ total value of assets of
as of the date prior to the subscription of shares at the total subscription price of Baht 122,500,000 by the existing shareholders. ** Long term loan for the deposit and part of the license/right fee
to the subscription of shares at the total subscription price of Baht 122,500,000 by the existing shareholders. ** Long term loan for the deposit and part of the license/right fee which must be paid to