- - Adder 33.9 28.1 (5.8) (17.1%) Other sales and service income 11.3 11.8 0.5 4.4% Sales from Municipal Solid Waste Power Plants 121.3 114.0 (7.3) (6.0%) Sales of electricity - Base tariff and Ft 3.4 5.3 1.9
and service income 11.8 13.8 2.0 16.9% Sales from Municipal Solid Waste Power Plants 114.0 126.4 12.4 10.9% Sales of electricity - Base tariff and Ft 5.3 5.0 (0.3) (5.7%) Sales from Solar Energy Power
services regarding waste management engineering (“Entire Business Transfer Plan”). 2 เลขที 1 อาคาร ทีพี แอนด์ ที ชนั 14 ซอยวิภาวดีรังสติ 19 14th Floor, TP&T Tower 1 Soi Vibhavadee-Rangsit 19 Tel : (662) 936
mainly caused by the increasing price of graphite electrode and higher repair and maintenance cost and the proportionate of an increased in raw material cost is greater than an increased in HRC market
last year which are mainly caused by the increasing price of graphite electrode and higher repair and maintenance cost and the proportionate of an increased in raw material cost is greater than an
proportion than selling price increase is the main reason why net profit decrease. Graphite Electrode’s price which is a part of conversion cost increase significantly. Separate financial statement, the
conversion cost. Cash conversion cost mainly increased from the increase of Graphite Electrode’s price. (Separate: Baht 4,724 million for the year 2018 and Baht 11,240 million for the year 2017, decrease Baht
depreciation) in 2nd Quarter of 2018 was achieved at THB 891/ton, lower by 14% from last year due to the increase in the price of graphite electrode (significantly increased from USD 2,000 per ton in the
are scheduled to achieve COD on 2019. VSPP, WHA KM.3 Solar with a total contracted capacity of 0.9 Equity MW, is scheduled to achieve COD in May’18. Another VSPP, Waste to Energy project under
the purpose of account payable payment of Baht 30 million, loan & interest repayment of Baht 30 million, to support the investment of waste water treatment construction in Mandalay of Baht 40 million