made to quality of service, and expanded the locations of service stations simultaneously with expansion of Non-Oil businesses, the total number of service as of the end of 2019 is more than 1,200
3 months for repayment of the loan due to MAT being in the process of restructuring and the new operating system setting. In addition, MAT was in the process of the capital increase and propose to
3 months for repayment of the loan due to MAT being in the process of restructuring and the new operating system setting. In addition, MAT was in the process of the capital increase and propose to
contacted the Company to request time for 3 months for repayment of the loan due to MAT being in the process of restructuring and the new operating system setting. In addition, MAT was in the process of the
of the Company which are different from the opinions of the Board of Directors’ opinion -None- 4 2. Servicing Space for Waste of the Manufacturing (Service Agreement) 2.1 Date of transaction September
Kasikorn Bank Public Company Limited. At this stage, the project cannot distribute water supply as a result of excavation process to the reservoir and the construction of the water supply system including
Industry Public Company Limited (“KSL”). Therefore, to effectively seek additional sources of fund as a channel of fund raising to adequately support the expansion, enhancement and strengthening of bio-based
relatively flat compared to 33.5% in 2018 due to higher depreciation expense from the expansion pipeline system. For our 2019 EBITDA was Baht 2,740.9 million, compared to Baht 2,854.8 million in 2018, or
proceeds of total THB 80-100 mn 3.) To invest in the Central Wastewater Treatment Plant and Collecting System of the industrial Zone of Mandalay project which the detail is in following table: Project Name
bidding process and the facilities support from financial institution which requires the proceeds of total THB 80-100 mn 3.) To invest in the Central Wastewater Treatment Plant and Collecting System of the