type of assets, the acquired assets still include a Permit for Factory Operation which operates fabric, yarn and artificial leather dyeing that is needed to run the company and subsidiaries’ businesses
there was still a temporary loss during the early stage of the commercial sales of the new product in the Jiangsu factory and the painting segment around Baht 12.6 million and Baht 13.3 million
Rent Asset To be the location of the factory building, 46 Moo 2, Khlong Khut Ban Bo Road, Chai Mongkol Subdistrict, Mueang Samut Sakhon District Samut Sakhon Province 74000. Utility Space 1,500 Square
CBP. The assets to be invested by the Trust consist of total area of 87-2-48.36 rai (approximately 140,193.42 square meters) and total leasable area of warehouse and factory of approximately 89,024.00
new factory that incurred as a result of lower-than-normal production capacity. Compared with the administrative expenses in 1Q20, a decrease of Baht 1.36 million or 4.48% is observed, and this is
Baht 5.01 million or 16.05% as compared to the same period in 3Q18. Such increase was due to an increase in staff costs and the reclassification of fixed costs at the new factory which incurred as a
because Aukkrarawat still has to bear the cost of the transportation of the material (Vinasses water) from the Biofuel Mitrphol Factory, Dan Chang which, currently, is 45 kilometers from the project
because Aukkrarawat still has to bear the cost of the transportation of the material (Vinasses water) from the Biofuel Mitrphol Factory, Dan Chang which, currently, is 45 kilometers from the project
deliverables are lower raw material and packaging costs, packaging optimization, new lighter weight bottles, and more formulation optimization. The new glass factory (SGA2), whose furnace has heated up in August
, increased the amount of 37.5 million Baht or 38.1%. The increase of non-current liability was due to the long term debt which was used for purchasing a new machine and building a new factory at Map Ta Put. -7