of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical
speed of the market has shifted from 30Mbps in 2017 to 50Mbps in 2018 with a similar price range of around Bt600. Overall, pure broadband operators mainly used pricing strategy while integrated operators
Direct and indirect Shareholding of GLOW (Percentage) Nature of Business Operation 1. Glow Hemaraj Wind Co., Ltd. 33.33 Developing wind power plant projects 2. Eastern Seaboard Clean Energy Co., Ltd. 33.33
Direct and indirect Shareholding of GLOW (Percentage) Nature of Business Operation 1. Glow Hemaraj Wind Co., Ltd. 33.33 Developing wind power plant projects 2. Eastern Seaboard Clean Energy Co., Ltd. 33.33
wind power plant projects 2. Eastern Seaboard Clean Energy Co., Ltd. 33.33 Holding shares in other companies 3. Rayong Clean Energy Co., Ltd. 33.33 Developing waste-to-energy plant projects 4. Chonburi
. Chonburi Clean Energy, a installed capacities of 8.6 MW Waste to Energy Power Plant, representing 2.9 Equity MW, is scheduled to achieve Commercial Operation Date in 4Q2019. Power plant Type of power
COD on July 8,2017) Another VSPP Waste to Energy project under development phase, namely Chonburi Clean Energy (CCE) with a total contracted capacity of 6.9 MW, representing 2.3 Equity MW, is
1/7 เลขท่ี 1 อาคาร ทีพี แอนด์ ที ชัน้ 14 ซอยวิภาวดีรังสติ 19 14th Floor, TP&T Tower 1 Soi Vibhavadee-Rangsit 19 Tel : (662) 936-1661-2 แขวงจตจุกัร เขตจตจุกัร กรุงเทพฯ 10900 Chatuchak, Chatuchak, Bangkok 10900, Thailand Fax : (662) 936-1669 ทะเบียนเลขท่ี 0107554000097 Registration No. 0107554000097 HYDROTEK PUBLIC COMPANY LIMITED บริษทั ไฮโดรเท็ค จ ำกดั (มหำชน) (Translation) No. 078/0960 21 September 2017 Subject: Notification of the Board of Directors No.8/2017 and the date of the Extraordinary...
, the fourth SPPs is scheduled to achieved COD on November 1, 2017 Another VSPP Waste to Energy project under development phase, namely Chonburi Clean Energy (CCE) with a total contracted capacity of