) determine the aggregate position limits for a client including the margin rate or value, based on fluctuation of derivatives prices as well as financial status, ability to deposit of margins and debt
investments in power associates increased by 6.2%. However, if excluding the FX impact and one-time loss items, normalized share of profit from associates and joint ventures in power business increased by 52.5
higher project value. The large projects delivered in the Q1–2024 such as the Construction project to renovate a deteriorated power station Bang Samak Power Station in Chachoengsao Province of the
0.17 2.84% Profit (loss) from exchange rate 1.81 0.66 1.15 175.88% 1.81 0.66 1.16 176.37% Total Revenue 406.40 327.64 78.75 24.04% 400.05 326.12 73.93 22.67% Sharing of gain (loss) from investment value
level close to its previous rate since early July 2019. Share of profit from the geothermal power plant in Indonesia was THB 107 million, attributed to share of profit from operation THB 199 million
& Trading Business Group 11 Marketing Business Group 13 Power Plant Business Group 14 Bio-Based Products Business Group 16 Natural Resources Business Group 18 Statement of Financial Position 20 Cash Flows
Power P estment in th 34.09 million sociated com 9, decreased Unit : Millio 201 8 5 3 n currency in 26.12%. The ge rate loss of 8% compared ting business rest expenses entures in the % from issued Plants
to 220,000,000 THB). The reference ex average exchange rate before the negotiation date between NDR and CRSB which is a period between August 18, 2017 and September 12, 2017. The exchange rate is
Company Limited (“the Company”) had refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) for total of Baht 10,000 Million with floating interest rate by issuing debentures with
revenue in 2018 from about 41 rai of land title deed transfer while it had only THB 45.06 million of revenue from about 15 rai of land transfer in 2017. ▪ The higher increasing rate of the cost of