September 2017. Currently, the company operates already 38.6MW of solar power plants of in total. The second solar power plant in Japan with installed capacity of 10.7MW will COD in March 2018, boosting total
Company discount price of fan. 2.2) Cost of renewable energy increase THB 1.22 million or 5.52%. The depreciation has increased due to the subsidiary installed additional solar panels. 2.3) Cost of Real
38.16 million or 68.15% from THB 56.00 million to THB 94.16 million. The recognition of license fee for products installed and growth in recurring services of HR Solution results in an increase in net
2020 The Company recognizes revenue from the production line installation project and the production line test for the whole system installation, which is expected to be installed in May 2020, resulting
installation of the production line and the testing of the production line in respect of the installation of the entire production line, which was installed successfully. In July 2020, the results of the
treatment system, and various facilities that have been installed and used in the building and structures of the project which will be invested in by CPNREIT, along with other rights relating to or in
growth 2019 was a remarkable year for B.Grimm with a 40% growth in operating capacity or by 820 MW to 2,896 MW while the company still have a number of under- development projects to drive total installed
Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe
, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar
as follows: 1) Kuno Solar Power Plant Location : Kuno City, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW - 14 - Feed-in Tariff (FiT) : 36 JPY / kWh Commercial