continued improvement in plant efficiency. • EBITDA margin increased y-on-y to 28.6% in Q2’2020 and 28.9% in 6M’2020 from 1) ABP5 and BPWHA1 improving heat rate after gas turbine upgrade in July 2019 and
enhance heat rate of gas turbine as well as overall power plant performances 3. Digitalization – to predict the degradation of each machine more accurate. Consequently, each plant will be able to minimize
91.52%, which is based on the Criteria of Total Value of Consideration, which is the highest result. Including of the Company does not have any assets acquired or disposed of during the 6 months prior to
) Contracted heat rate 7,409 Btu/KWh. Based on the current draft of Notification and proposal from our preferred EPC, we are confident that our qualified SPP projects, namely ABP1, ABP2 and BPLC1, would obtain
other Siemens gas turbines on next scheduled major over haul: 1. Availability – to increase availability or reduce a number of maintenance days 2. Efficiency – to enhance heat rate of gas turbine as well
allowance for asset impairment amounting to Baht 31 million for Combined Heat and Power Producing Company Limited (CHPP) to be disposed. When comparing to Q1/2017, non-operating income and expenses decreased
the agreement with PTTPL to be EPC for solar rooftop and BESS project On 13th July 2018, Combine Heat and Power Producing Company Limited (CHPP), in which GPSC has hold 100% stake, has signed the
during Q1/2017 and there was the shutdown for commissioning in Q3/2017. 17 Management Discussion & Analysis (MD&A) Q3/2017 Management Discussion & Analysis Combine Heat and Power Producing Company Limited
250 237 (5%) (4%) 255 247 (3%) Management Discussion & Analysis Management Discussion & Analysis (MD&A) Q4/2017 and FY2017 ผลประกอบ การบริษัท Gross profit of the Combined Heat and Power Producing
the collateral under the aforesaid settlement agreements, providing that such reverse value is lower than the appraised price of the collateral because it was made on a conservative basis, based on the