, electricity and water supply for 15 years Additional 25% deduction of the cost of installation or construction of facilities apart from the usual depreciation expenses 4.2) Asset Obligations -None
% reduction of corporate income tax Double deductions from the costs of transportation, electricity and water supply for 15 years Additional 25% deduction of the cost of installation or construction of
electricity, water supply, communication and fire extinguishing system. Additionally, the decoration of the entire park has been partly designed and decorated. There are also parts which require further
electricity, water supply, communication and fire extinguishing system. Additionally, the decoration of the entire park has been partly designed and decorated. There are also parts which require further
received space rental revenue at a rate of Baht 44 .42 per square meter. The Company also received the payment for electricity, water supply, telephone usage according to the actual usage volumes. All rate
system including the electricity, water supply, communication and fire extinguishing system. Additionally, the decoration of the entire park has been partly designed and decorated. There are also parts
development of utility system including the electricity, water supply, communication and fire extinguishing system. Additionally, the decoration of the entire park has been partly designed and decorated. There
buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the electricity, water supply, communication
of hydro project in Lao PDR Nam Che 1 hydro power plant (Run of the river) with an installed capacity of 15 MW commenced COD on June 1, 2019 to supply electricity to Electricity du Laos (EDL) under a
electricity and have started to supply to Electricity Generating Authority of Thailand (EGAT) from 15 November 2017. When comparing 2017 and 2016, the revenue for 2017 was Baht 19,917 decreased by Baht 758