project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
and services segment showed improvement during the last quarter of the year as a result of the government’s economic stimulus. Private investment contracted in all investment categories from the
, world trade volume, global economy, and Thai exports to grow slower than expected As of December 31, 2018, the country’s contracted capacity in 3 power authorities system was 48,990 megawatts, 15,790
the previous yearly. To: The President The Stock Exchange of Thailand In the fourth quarter of the year, the Thai economy grew by only 2.4%, which is contracted according to domestic factors. Especially
Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe
, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar
as follows: 1) Kuno Solar Power Plant Location : Kuno City, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW - 14 - Feed-in Tariff (FiT) : 36 JPY / kWh Commercial