Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
operations of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
99.99 percent of total paid-up capital of HYDRO. The contract is for a period of 30 years. The Project, production and distribution of water supply, has water sources from old mine area about 340 Rai
principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which dialysis
performance of Boonterm kiosk with the ARPU management more than 5% of growth from 2017 and relocating the kiosks from the area that generate low income to the new area that generate higher income. As well as
Government Savings Bank, the Project of information and communication technology Installation of the New Parliament Phase 2, the Project of the cables underground to enhance the area for the Eastern Aviation
Installation 3.49 7.92 (4.43) (55.93%) 3 - Construction 1,079.05 645.15 433.90 67.26% 4 - Testing and Inspection 57.22 61.43 (4.21) (6.85%) 5 Cost of sales and services (1,734.66) (1,473.90) 260.76 17.69% Gross
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
a building and the installation of electricity-generating machinery at the exaggerated price of 58 million baht. Nongree Power Plants, approved by Mr. Bhusana, paid for the first instalment of 12.48