production, selling goods, assembling engines, as well as receiving of returned goods and disassembling of engines and spare parts for auction as metal scrap. This resulted in AMAC’s 2008 and 2009 financial
concerning purchasing raw materials, hiring for spare parts mold production, selling goods, assembling engines, as well as receiving of returned goods and disassembling of engines and spare parts for auction
statements concerning purchasing raw materials, hiring for spare parts mold production, selling goods, assembling engines, as well as receiving of returned goods and disassembling of engines and spare parts
จากการแปลงค่างบการเงินจากค่าเงินบาทที่แข็งขึน้ก็ตาม ประกอบกบัรายได้จาก Elite Heaven ที่บริษัทเข้าลงทนุไปเมื่อไตรมาส 3 ธุรกิจโรงแรมที่ลงทุนเอง หมายเหต:ุ ข้อมูลทางสถิติไม่รวมโรงแรมดสิุตปร๊ินเซส โคราช
, the Company’s subsidiaries consist of Irving Corporation Limited operating product distribution and equipment, design, assembling, and installation of water treatment systems for medical business
company operation were design, manufacture, assembling of refueling vehicles and aircraft service equipment. Currently, the payment of shares, Bt54.0 million, was already paid and 2) BPTG Company Limited
company operation were design, manufacture, assembling of refueling vehicles and aircraft service equipment. Currently, the payment of shares, Bt54.0 million, was already paid and 2) BPTG Company Limited
) studying, researching and assembling information relating to economic and financial situation of foreign countries; (2) being liaison between its clients or foreign institutions and head office, without any
with the following scopes: (1) studying, researching and assembling information relating to economic and financial situation of foreign countries; (2) being liaison between its clients or foreign
in accordance with the following scopes: (1) studying, researching and assembling information relating to economic and financial situation of foreign countries; (2) being liaison between its clients or