the occupancy rate on the opening day at 80%. - CentralPlaza Mahachai, the 32nd shopping mall, was officially opened on November 23, 2017, with the exterior and interior designs portrays the MAHANAVA
amounting to 3.54 Million Baht, or 23.23% compared to the last year as; - During 2019, the Group has gain on selling of scrap and unused construction machine equipment and consumable amounting of 3.40 Million
. Increased of Baht 3.40 Million, from same period of last year. Due to the Group has profit from selling scrap and unused construction machine, equiptment, and consumable during the year. Moreover, during
because of the following; - Decreased in gain on foreign exchange rate from Q1’19 amounting of 1.53 Million Baht and gain on selling of scrap and unused construction machine equipment and consumable
labor, tool and consumable, including hygiene products used for preventing the spread of coronavirus. Q2/2020, the Group’s has net profit attributable to owners of the parent totaling of Baht 13.49
The Group’s other revenue of Q3/2019 totaling of Baht 2.29 Million. Increased from same period of last year, because of the Group has profit from selling scrap and unused construction consumable. 3
to be able to transfer some villas to the customers during Q1 2018. MahaSamutr Country Club and Sports Club are currently in the process of infrastructure including exterior and interior decoration
including exterior and interior decoration. Nimit Langsuan Project: The construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 11, the floor slab of level 9 is
, MahaSamutr Country Club and Sports Club are currently in the process of infrastructure including interior and exterior decoration. Nimit Langsuan Project: The construction of Nimit Langsuan project is in the
villas to the customers in 2019. Besides, MahaSamutr Country Club and Sports Club are currently in the process of infrastructure including interior and exterior decoration. Nimit Langsuan Project: The