Equipment increased by THB 34 million due to plant expansion to support foreign branches expansion and the opening of 3 new branches. • Other Current Assets increased by Bath 316 million. This was mainly due
: Current shareholding structure of TSEO Name of shareholders No. of shares (shares) % shareholding 1. Thai Solar Energy Public Company Limited 51,499,997 99.997% 2. Miss Cathleen Maleenont 1 0.001% 3. Mr
disclosed, nor statement that may be materially misleading. 2. Financial projection for the current year -None- 2 3. Pending material lawsuits or claims As of March 31, 2019, the Company had pending material
สภาพคล่อง ก. การคำนวณมูลค่าเงินลงทุน ให้บริษัทคำนวณมูลค่าเงินลงทุนโดยยึดหลักของราคาที่สะท้อน current value ดังต่อไปนี้ 1. Exchange-traded instruments หมายถึง หลักทรัพย์ดังต่อไปนี้ 1.1 หลักทรัพย์ ตราสาร
with sustainable growth. Projects under construction are on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 50.7% current construction progress which is on process
possessed for a member, a derivatives clearing house shall perform the following actions: (1) create and maintain for each member an accurate and current register of assets received from or possessed for the
on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 86.64% current construction progress which is on process of drainage system piping, double layer brick wall and
million, other current assets increased by Baht 18.79 million, caused by the taxes on the construction and machinery which waiting for the tax credit of the subsidiaries, and the Company decreased the
value that has been revalued to reflect the current market prices of raw materials, which some items were in downtrend and the significant appreciation of Baht, resulting in higher cost of goods sold. The
5,268.76 47.79% 24. Backlog 7,489.27 8,510.52 (12.00%) 6,962.87 7,948.17 (12.40%) 25. Other current assets 40.47 30.26 33.74% 497.00 482.00 3.11% 26. Non-current assets 2,971.55 2,555.01 16.30% 3,274.34