. The other project was the property project for investment in the rental market i.e. Lumpini Township Rangsit-Khlong 1 Phase 3 (Building F). Around 80% of condominium units in three buildings was already
, together with lower revenues from matured branches from the slowdown in the country’s economic conditions and competitive landscape in the industry. However, revenues from branches in the ramp-up phase
invest in assets of the infrastructure business that is a greenfield project, a step-by-step operation plan, 4 starting from construction to completion of the construction, as well as the management and
contribution from GHECO-One of Baht 347.9 million driven by the step down of contractual Availability Payment Rate, lower Energy margin and Tax rate 10% since November 2019 ii) lower contribution from SPP
impacting the Group’s financial position, operating results, and cash flows at present, and is expected to do so in the future. However, the impact cannot be reasonably estimated at this stage. The Group’s
invoices were issued to receivables for project that had been delivered according to the completion stage but had not yet the due date for sending invoices for last year's collection. As the result, the
efficient and reducing future collection costs. Since AEON systems develop the New Collection system successfully in phase 1, SIGMAXYZ Inc. will co-ordinate with AEON Systems to improve the previous
33.7 Mn in 2017, an increase of THB 25.0 Mn or 287.4%. This increase was mainly due to (1) the increase in construction fees collected from franchisees during the setup phase and (2) increased in rebate
was mainly due to (1) the increase in net construction fees collected from franchisees during the setup phase which itself was related to the opening of new franchise branches and (2) increased rebate
value of the associate and joint venture 10.76 -0.87 11.63 N.A. 2 already accomplished the commencement of commercial operation for the 1st phase 50MW from totaling 220 MW. 2. Cost of goods sold and