(0.11) (5.95%) - Construction 287.89 219.73 68.16 31.02% 2 - Testing and Inspection 13.89 13.12 0.77 5.87% 3 Cost of sales and services (442.04) (406.41) 35.63 8.77% Gross Profit 43.73 30.54 13.19 43.21
Installation 3.49 7.92 (4.43) (55.93%) 3 - Construction 1,079.05 645.15 433.90 67.26% 4 - Testing and Inspection 57.22 61.43 (4.21) (6.85%) 5 Cost of sales and services (1,734.66) (1,473.90) 260.76 17.69% Gross
- Construction 377.21 156.37 220.84 141.23% 4 - Testing and Inspection 14.60 10.42 4.18 40.12% 5 Cost of sales and services (524.43) (327.53) (196.90) 60.12% Gross Profit 58.50 33.62 24.88 74.00% Other income 2.77
) (23.90%) 3 - Construction 343.54 192.48 151.06 78.48% 4 - Testing and Inspection 15.83 16.83 (1.00) (5.94%) 5 Cost of sales and services (494.89) (362.98) 131.91 36.34% Gross Profit 56.52 44.38 12.14 27.35
ratio) 7 : 1 6 : 1 * ) 12 5. KPMG 2564 Big 4 Independence testing 6. KPMG 2564 Big 4 1 13 7. KPMG 2564* Big 4 (Listed company /partner) 22 2.84 * / portfolio allocation 2 108 / KPMG 2564 54
(staff/ partner ratio) 19 : 1 25 : 1 (staff/ manager ratio) 3 : 1 6 : 1 * ) 11 5. EY 2563 - 2564 Big 4 Independence testing 6. EY 2563 Big 4 1 12 7. EY 2563* Big 4 (Listed company /partner) 3.983 2.84
. The SEC may consider an expiry extension to allow greater flexibility for conducting the testing operations. Sandbox participants would be allowed to provide services exclusively to foreign tourists who
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System