focusing on expanding network capacity in high-traffic areas to improve customer experience and drive mobile revenue growth. Currently, 5G subscribers have reached 11.5 mn subs or 25% of total subscriber
in Indonesia, resulting in 2017’s PPA capacity increasing to 332 MW from 145 MW in 2016. Bio-based Product Business recorded better performance. Ethanol Fuel Business’s performance improved from the
20.7% increased Q-o-Q from 18.9% but decreased Y-o-Y. In principle, the cost of production is influenced by factors such as the capacity utilization rate, product mix, a change in LME copper price and
cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province. The project has entered into
cycle cogeneration power that commenced COD on October 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as
Bank include capacity building workshops, and technical assistance catering to the differing capacity levels of ASEAN members. These initiatives would complement AARG?s on-going efforts to raise the
period (during the low electricity tariffs) and the average capacity utilization was only 37.25%, thus, the current estimated useful lives under straight-line depreciation method caused the Company to
factory is equipped with state-of-the-art technology that allows higher production efficiency, improves capability for lighter-weight bottle production and offers flexibility of raw material usage
beauty businesses. At present, it is in the process of filing the trade accounts receivable. As a result, the current ratio has decreased as compared to the previous year. However, considering the ability
, almost 89% of total net trade and other receivables, were under current due. Inventory (net) as of 30 June 2019 amounted to Baht 10,003 million, an increase of Baht 542 million or 5.7% from 31 December