year due to the Company entered the Tolling agreement with G Steel for producing of HRC to increase the normal capacity during off peak power usage commencing in 4th Quarter of 2017 till to present which
than last year due to the Company entered the Tolling agreement with G Steel for producing of HRC to increase the normal capacity during off peak power usage commencing in 4th Quarter of 2017 till to
quarter due to the Company entered the Tolling agreement with G Steel for producing of HRC to increase the normal capacity during off peak power usage commencing in 4th Quarter of 2017 till to present which
services from the Company continuously. Management's Discussion and Analysis and operating results for the Quarter 2’ 2018 Page 7 / 7 5.6 Continue to offer new products, the machine producing high
new products, the machine producing high concentration ozonated water for foods and beverage industrial (Biosure) and the machine producing high concentration ozonated Water For Management's Discussion
-kW floating solar installed at PTT Tank Terminal Company Limited in Map Ta Phut, Rayong. GPSC, as a power flagship of PTT Group, has commission Combined Heat and Power producing Company Limited (CHPP
-Current asset 419.12 30.5% 427.47 27.7% 8.35 2.0% Total Assets 1,372.78 100.0% 1,543.90 100.0% 171.12 12.5% Liabilities Current liability 118.33 8.6% 139.61 9.0% 21.28 18.0% Non-Current liability 57.26 4.2
leasing agreements on Financial Statement followed to TFRS 16 Leases. 4.2 Liabilities The total liability as at 31 March 2020 was increased from the year 2019 by Baht 73.80 million or 20.39 percent
-of-use’ and ‘lease liability’ at the present value of lease payment over the remaining lease term. The leases including tower lease agreement, site rental, office & shop building rental, and minimum
-of-use’ and ‘lease liability’ at the present value of lease payment over the remaining lease term. The leases including tower lease agreement, site rental, office & shop building rental, and minimum