. Currently, the construction of the factory building, and machine installation has been partially completed. Anywise, the company had to repay loans and interest regularly. 7. The performance of the company
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
installation capacity 7.5 MW of Prize of Wood Green Energy at Narathiwas Province which this project is held 99.99 percent of total shares by SAFE. The Company could gain profit sharing from the 1st Quarter 2018
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
? shares, construction contracts, machinery procurement and installation contracts, as well as misuse of NE and ESES whose controlling person was Bhusana as a channel for committing fraudulent acts in many
of operations of the Group The Group has principally engage in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system
IVL as a whole in 2019. o Sharp decline in crude prices (high of $ 83/bbl in 3Q18 versus low of 54/bbl in 4Q18) as we entered in to the weak season led to accelerated destocking in the integrated PET
- denominated debt. Economic Outlook for 2020 In 2020, Thailand’s economic growth will likely slow to the range of 1.9 - 2.3 percent on account of several challenges. External factors include a sharp drop in
experiencing sharp decline of global crude price between November to December 2018. 3. BCP T r a d i n g Pte., Ltd. increased its revenue by 37% from Q4/2018 from increased trading transaction of petroleum
million, resulting from the sharp rise in average crude oil price during the quarter, while in Q2/2017 recorded an inventory loss in the amount of THB 1,010 million (included LCM of THB 7 million). Average